Proposals for levee setback and floodplain construction on Reecer Creek were received on July 14 at Ellensburg’s City Hall. Mid-Columbia Fisheries is currently taking the bids under consideration. The bid tabulation may be downloaded here: Reecer Creek Floodplain Restoration Bid Summary
Reecer Creek Floodplain project bids opened
This entry was posted in Uncategorized. Bookmark the permalink.